An ERP system in place, and planning that still ran on judgment.
A leading confectionery manufacturer’s ERP system had launched with problems, and its material planning had never been fixed. Starting in 2009, Synergetics led 13 cross-functional teams in building new material planning processes and tools for the manufacturer, then trained teams to install them in 10 plants in the U.S. and Mexico, raising planning and scheduling labor productivity 20%.
- 30% reduction in material inventories after the new processes went in
- 10 plants in the U.S. and Mexico on one planning process
- 12 follow-on projects in efficiency and equipment reliability
The challenge
A leading confectionery manufacturer’s first ERP installation had numerous start-up problems and needed several system enhancements. Material requirements planning (MRP) processes and systems had never been addressed.
Each plant planned a little differently, by hand and on subjective impressions, and corporate processes kept the company from using exception-based MRP planning. Without a standard way to plan across facilities, production efficiency and the bottom line would suffer.
Our approach
A review of every material planning process, system and tool, then new processes built with 13 cross-functional groups and installed plant by plant.
What we actually did
- Reviewed every business process, system and tool tied to material planning
- Directed 13 cross-functional groups in building new processes and tools for MRP
- Trained teams to install the new processes in 10 plants in the U.S. and Mexico
- Brought corporate procurement onto the same processes
- Made planning and procurement more effective and efficient in plants and corporate offices
The results
Planning productivity up and material inventory down, across 10 plants and corporate procurement.
Key outcomes
- 20% increase in planning and scheduling labor productivity across the plants and corporate offices
- 30% reduction in material inventories after the new processes went in
- 10 plants in the U.S. and Mexico on one planning process
- 12 follow-on projects in efficiency and equipment reliability
What’s still running today
- One MRP planning process across 10 plants
- The same processes in corporate procurement
- Teams trained to install and run the new processes
The work led to a lasting relationship: 12 more projects in efficiency and equipment reliability, each aimed at further savings.
Related work
Private Equity
$6M+ a year in distribution cost savings
A PE-backed packaged-ice producer couldn’t predict demand closely enough to schedule its deliveries, and each of its 90 locations ran its own way. An AI demand forecast and one operating model cut distribution cost per ton 10%, worth $6M+ a year.
Read the case study
Consumer
OEE from 57% to 78%
Eli's Cheesecake Company, a Chicago-based specialty dessert manufacturer, had outgrown its ability to see and act on production data as it happened. A team embedded on the floor before its new software went live raised OEE from 57% to 78% and cut unplanned downtime 26%.
Read the case study
Consumer
$6M in annualized EBITDA
A national retailer's parts and warranty services divisions were losing revenue and slow to adjust labor and overhead. A new management operating system turned around revenue and margin, adding $6M in annualized EBITDA.
Read the case study
1/3Case study 1 of 3
Let us help you figure out where to start.
You know the number that has to move but not which solution moves it? Let’s start with that number.
Talk to an advisor