Healthcare · Healthcare Services
The Organizational Restructuring That Saved $14.7M
- PE-backed·
- 3M+ members
A 12-week diagnostic that turned into 19 months of execution.
A PE-backed healthcare navigation platform needed a leaner cost structure without breaking a service its members depended on daily. Starting in June 2024, Synergetics ran a 12-week organizational design diagnostic for the company, then stayed through December 2025 to carry it out, and the follow-on work that came from it, delivering $14.7M in annualized labor savings.
- $12.2M of opportunity sized by the 12-week diagnostic
- 12% improvement in span of control, from 9.5 to 10.6 direct reports per manager
- 19 months of continuous work, June 2024 to December 2025
The challenge
The sponsor needed a leaner cost structure, and needed it without breaking a service business that 3M+ members depended on daily. Our 12-week organizational design diagnostic identified $12.2M of opportunity. Synergetics stayed to carry out the findings, and the work grew into a 19-month operating partnership spanning the restructure, technology outsourcing, an acquisition integration, clinical model efficiency, a contact center migration against an immovable vendor deadline and an AI agent in production.
Our approach
A 12-week diagnostic, a 30-week restructure run through a program management office (PMO), then follow-on work across technology outsourcing, an acquisition integration, the clinical model, the contact center and AI.
What we actually did
- Organizational design and restructure: ours end to end. Diagnostic, design and the PMO that executed it
- Technology outsourcing: we ran selection, transition governance and knowledge transfer; the vendor delivered the service
- Contact center migration: we ran the program across five waves and 20 business units, with minimal service disruption; the telephony vendor built the platform
- AI agent: we documented business requirements, workflow triggers and change management; the vendor built the production model
What the plan had to account for
- Competing priorities across the business while the contact center migration ran
- Legacy workflows had little documentation
- Change requests kept arriving close to go-live
- Running the old and new platforms in parallel carried its own risk
- Ticket volume ran high after launch
The results
- A management operating system and span-of-control discipline the business runs itself
- Vendor governance across outsourced technology and contact center operations
- A production AI agent processing high-cost clinical cases inside the client’s own workflow
Each follow-on engagement was sold on what the last one put on the client’s P&L.
$14.7M in annualized labor savings from one diagnostic and the 19 months of work it grew into.
Related work
Private Equity
127% of the committed EBITDA target
A PE-backed refrigeration and HVAC service business had 60+ branches and no common way of running them. Synergetics moved every branch onto one operating model its own leaders run, adding $7.6M in annualized EBITDA.
Read the case study
Private Equity
$6M+ a year in distribution cost savings
A PE-backed packaged-ice producer couldn’t predict demand closely enough to schedule its deliveries, and each of its 90 locations ran its own way. An AI demand forecast and one operating model cut distribution cost per ton 10%, worth $6M+ a year.
Read the case study
Private Equity
$5.7M in EBITDA savings in year one
A PE-backed foodservice supplier had grown revenue 20-fold with flat margins and no common way of running its depots. Synergetics built one model depot, then rolled one management operating system across the network: $5.7M in EBITDA savings.
Read the case study
1/3Case study 1 of 3
Let us help you figure out where to start.
You know the number that has to move but not which solution moves it? Let’s start with that number.
Talk to an advisor