
Industrials · Commercial & Professional Services
Why One Operating Model Was Worth $7.6M in EBITDA
- 60+ branches·
- PE-owned·
- Commercial & industrial refrigeration & HVAC service
Sixty branches. Sixty ways of working. One operating model.
A PE-backed refrigeration and HVAC service business had built a national footprint without a national way of running it. From February 2025 to June 2026, Synergetics moved the business’s 60+ branches onto one operating model its own leaders run, adding $7.6M in annualized EBITDA validated by the client’s Finance team.
- 127% of the committed target, against a $6.0M annualized EBITDA commitment
- 60+ service branches standardized onto one operating model
- 16 months from start to handover, executed live nationwide with no pause in customer service
The challenge
The business had grown into a national footprint without a national operating model. Each branch had evolved its own way of dispatching work, managing technicians and reporting performance. Office teams that went remote during COVID largely never returned, and the branch—the unit that actually owns the P&L—had stopped functioning as a place where work is managed.
Leadership could see the financial result of that at quarter end but had no way to see the operations that produced it, and no lever to change them. Meanwhile revenue was leaking at the point of service, in small amounts, thousands of dollars a week. A defined value-creation window meant it had to be fixed without pausing the business.
Our approach
Over 16 months, the model went from one pilot branch to about 30, then to the full network, with no pause in service to customers. The client named the program Project Phoenix and used the name with its own customers to explain what would change for them.
What we actually did
- Defined four roles per branch and sourced 180+ frontline people and 45+ branch managers into them—mid-rollout, without pausing service
- Rebuilt 60+ branch offices into co-located operating “bullpens” with 175+ displays and 360+ workstation monitors
- Wired live Power BI dashboards into source systems—roughly a dozen operating metrics per branch
- Deployed telematics so drive time and site presence could be seen and managed for the first time
- Moved branch and service management roles from hourly to salaried to close the unbilled overtime gap
What the plan had to account for
- This was a return-to-office program as much as an operating program. Branch teams had been remote since COVID and most had never come back.
- Peak cooling season made a continuous rollout impossible. We paused deployment and used the pause to audit the branches already live, then resumed.
- Sourcing 180+ people across 60+ markets was the constraint on pace, not the model design.
- Regional directors had never been asked to own their numbers in front of the C-suite. Building that habit took longer than building the dashboards.
The results
- One operating model running across 60+ branches
- A weekly-to-monthly governance cadence run entirely by client leadership
- 180+ frontline operating roles and 45+ branch managers, in seat and trained
- Live performance dashboards maintained inside the client’s own reporting environment
- A benefit-tracking method their Finance team runs and validates independently
- Regional directors accountable for their own numbers, reporting to their VPs and C-suite
Sixteen months. Five extensions. Every dollar of benefit measured operationally and validated by the client’s own Finance team through standard financial controls.
Phoenix has been a game changer. The Synergetics team didn’t just deliver a plan—they built the operating system, capability and infrastructure to sustain results. The impact is real, measurable, and built to last.
Related work
Private Equity
$14.7M in annualized labor savings
A PE-backed healthcare navigation platform needed a leaner cost structure without breaking a service 3M+ members rely on. A 12-week organizational design diagnostic turned into 19 months of execution and $14.7M in annualized labor savings.
Read the case study
Private Equity
$6M+ a year in distribution cost savings
A PE-backed packaged-ice producer couldn’t predict demand closely enough to schedule its deliveries, and each of its 90 locations ran its own way. An AI demand forecast and one operating model cut distribution cost per ton 10%, worth $6M+ a year.
Read the case study
Private Equity
$5.7M in EBITDA savings in year one
A PE-backed foodservice supplier had grown revenue 20-fold with flat margins and no common way of running its depots. Synergetics built one model depot, then rolled one management operating system across the network: $5.7M in EBITDA savings.
Read the case study
1/3Case study 1 of 3
Let us help you figure out where to start.
You know the number that has to move but not which solution moves it? Let’s start with that number.
Talk to an advisor