Revenue up 20-fold. Margins flat. No common way of running the depots.
A PE-backed foodservice supplier had grown revenue 20-fold while its margins stayed flat, and its depots ran without a common process or performance metric. Between November 2008 and September 2009, Synergetics built one model depot and rolled a single management operating system out across the supplier’s depot network, delivering $5.7M in EBITDA savings. The client was still running the system years after the engagement ended.
The engagement delivered $5.7M in EBITDA savings in its first year. It was one of several initiatives behind the company’s results that followed.
- $9M to $30M in company EBITDA performance over two years, with this work one of several initiatives behind it
- $270M exit value when the original sponsors sold the business to a new sponsor
- 20% reduction in field operating expense across the depot network
The challenge
Sponsors had grown revenue 20-fold since their initial investment, reaching $263M by 2008, but profit margins remained stubbornly low and the emerging recession was compressing the window to course-correct. A three-day pre-assessment across seven depots found the cause: no consistent process implementation, no performance metrics across the hub network and limited corporate visibility into or control of what field operations were actually doing. The business had scaled its footprint without scaling the way it was run.
Our approach
A three-day pre-assessment, a four-week analysis, one model depot, an eight-location pilot and a network-wide rollout, run with a client PMO and dedicated staff working alongside our consultants.
What we actually did
- Built a model service depot on one management operating system—resource requirements, skills assessment and reporting standards defined
- Established weekly meetings at every management level, which is what actually drove improvement and best-practice transfer
- Centralized routing and moved to daily route planning, normalizing workloads across the network
- Loaded trucks to prescribed routes only, cutting on-hand oil inventory at the same time as fuel cost
- Centralized call management with training so problems were resolved on the first call, without a second site visit
- Rebuilt accounts receivable process flows and centralized collections
What the plan had to account for
- The engagement ran from November 2008 to September 2009. The client was heading into a recession with margins already flat.
- Five workstreams ran concurrently across a live route-based delivery network serving about 17,000 customers.
- Management basics were missing. An audit rated the depots at 11% to 21% of a fully functional management operating system, and no depot ran daily issue reviews or performance scorecards.
- Depots worked around their systems. Some ignored the routing software, driver tracking had never been switched on and trucks were filled to capacity before every route.
- Each of the 36 depots ran collections its own way, and some kept delivering to customers on credit hold.
- $1.8M of the $6.0M in parts inventory was obsolete or slow-moving.
The results
- A measurement system the client still uses years later, adapted to workstreams we never touched
- Weekly management meetings at every level, which is what drove the improvement
- Centralized routing and call management running inside their own operation
Years after the engagement ended, the client was still running the measurement system and had adapted it for parts of the business Synergetics never touched.
The impact has been a long term, sustainable 20% reduction in our field operating expenses and a significant reduction in our working capital needs.
Related work
Private Equity
127% of the committed EBITDA target
A PE-backed refrigeration and HVAC service business had 60+ branches and no common way of running them. Synergetics moved every branch onto one operating model its own leaders run, adding $7.6M in annualized EBITDA.
Read the case study
Private Equity
$14.7M in annualized labor savings
A PE-backed healthcare navigation platform needed a leaner cost structure without breaking a service 3M+ members rely on. A 12-week organizational design diagnostic turned into 19 months of execution and $14.7M in annualized labor savings.
Read the case study
Private Equity
$6M+ a year in distribution cost savings
A PE-backed packaged-ice producer couldn’t predict demand closely enough to schedule its deliveries, and each of its 90 locations ran its own way. An AI demand forecast and one operating model cut distribution cost per ton 10%, worth $6M+ a year.
Read the case study
1/3Case study 1 of 3
Let us help you figure out where to start.
You know the number that has to move but not which solution moves it? Let’s start with that number.
Talk to an advisor