How Eli’s Cheesecake Raised OEE From 57% to 78%
- Hundreds of SKUs·
- Multiple production lines
Hundreds of SKUs, several lines and downtime logged after the fact.
Eli’s Cheesecake Company, a Chicago-based specialty dessert manufacturer, had outgrown its ability to see and act on production data as it happened. Synergetics embedded a team on its production floor before the plant’s new Synovate LineBeat software went live, raising overall equipment effectiveness (OEE) from 57% to 78% and cutting unplanned downtime 26%.
- 26% reduction in unplanned downtime, from 73 to 54 hours a week
- 44% increase in First Quality Value
The challenge
Eli’s Cheesecake runs multiple lines across baking, finishing and packaging, making hundreds of SKUs for national retail, foodservice and hospitality customers. As it grew, the operation got more complex faster than the plant could capture and act on production data.
Nobody had a single, real-time view of performance across lines, and downtime went into the log after the fact. Onboarding varied by shift and by line, and continuous improvement work had no data behind it to make gains stick.
Our approach
A team on the production floor before a single screen went live, with the software rollout built around the three reasons manufacturing execution systems fail: inadequate training, poor data integrity and no continuous improvement governance.
What we actually did
- Embedded a Synergetics team on the production floor before the software went live
- Put real-time production dashboards in place with line-level visibility
- Set up downtime tracking and trend analysis so maintenance could act before failures
- Tied KPI monitoring to each associate's performance
- Built structured onboarding workflows and data integrity governance protocols
The results
OEE up 21 points, with less downtime and more output passing quality the first time.
Key outcomes
- 57% to 78% overall equipment effectiveness (OEE), a 21-point gain, or 37% relative
- 26% reduction in unplanned downtime, from 73 to 54 hours a week
- 44% increase in First Quality Value, the dollar value of output that passes first-pass quality at book price with plant capacity held constant, from an index of 84 in Q3 2024 to 121 in Q4 2025
What’s still running today
- Real-time production dashboards with line-level visibility
- Downtime tracking and trend analysis for maintenance
- KPI monitoring tied to individual associates
- Structured onboarding workflows and data integrity governance
Synovate is the tool for us to maintain profitability and growth. This was a quantum leap for us to ensure our future growth and success.
Related work
Private Equity
$6M+ a year in distribution cost savings
A PE-backed packaged-ice producer couldn’t predict demand closely enough to schedule its deliveries, and each of its 90 locations ran its own way. An AI demand forecast and one operating model cut distribution cost per ton 10%, worth $6M+ a year.
Read the case study
Consumer
$6M in annualized EBITDA
A national retailer's parts and warranty services divisions were losing revenue and slow to adjust labor and overhead. A new management operating system turned around revenue and margin, adding $6M in annualized EBITDA.
Read the case study
Consumer
$2.8M in annualized labor savings
A fresh produce processor's value-added line was growing faster than its packaging floor could keep up. One model bagger, then a management operating system across packaging, trim and dry, delivered $2.8M in labor and $10M in yield savings a year.
Read the case study
1/3Case study 1 of 3
Let us help you figure out where to start.
You know the number that has to move but not which solution moves it? Let’s start with that number.
Talk to an advisor